Language:EN
Pages: 33
Rating : ⭐⭐⭐⭐⭐
Price: $10.99
Page 1 Preview
security threat detection and testingwireless netw

Security threat detection and testingwireless network

T-1.8.1_v.3

N/A

Assessment No

Assessment Type Report Writing
George St

Week-4

Due Date

ICTICT401 Determine and confirm client business requirements

Unit Code (s) and ICTNWK405 Build a small wireless local area network

procedure were explained to me.

Details of Assessor

Feedback to Student
Progressive feedback to students, identifying gaps in competency and comments on positive improvements:

______________________________________________________________________________________ ______________________________________________________________________________________ ______________________________________________________________________________________ ______________________________________________________________________________________ ______________________________________________________________________________________ ______________________________________________________________________________________

Page 1

The purpose of this assessment is to assess the student in the following

Competent

Not yet

ICTICT401 Determine and confirm client business requirements

1. Determine context of business need or problem

1.3 Develop objectives and identify expected outcomes to be achieved

1.4 Document the business problem

2.2 Record client responses

2.3 Analyse gathered information to identify new system requirements and

3. Confirm system specifications

3.3 Make changes to the documentation as necessary and indicated by the

client

network

1.2 Identify most suitable network design to meet client requirements

determine the most appropriate to meet client requirements

1.6 Source vendors and service suppliers to obtain specifications, availability

2.2 Liaise with appropriate person to obtain approval for plans, including

security clearance and timing

4.1 Identify possible security concepts and technologies relevant to securing

the network

Page 3

possible network attacks

4.3 Troubleshoot different types of security intrusion symptoms and issues

ICTNWK410 Install hardware to a network

1. Determine network hardware requirements

organisational guidelines

1.3 Evaluate client requirements according to organisational guidelines,

organisational guidelines

2.3 Document recommendations and provide copies to appropriate person

4. Provide instruction and support for installed products

4.3 Obtain client evaluation and feedback to ensure that client requirements

ICTNWK405 Build a small wireless local area network

1. Confirm client and equipment requirements

1.3 Evaluate requirements along with business needs, and translate into

technical requirements

1.6 Arrange for preliminary work to be carried out to meet cabling and power

requirements

student who is assessed as NYC (Not Yet Competent) is eligible for re-assessment.

Resources required for this assessment

competent for this unit of competency.

· If you are not sure about any aspect of this assessment, please ask for clarification from your assessor.
·

Please refer to the College re-assessment for more information (Student handbook).

Page 5

In this assessment task, you are required to gather, determine and confirm client requirement and review available network technologies, devices and protocols to build WLAN (Wireless Local Area Network) for small office or home office network by choosing appropriate hardware and software in accordance to business and technical requirements including installation plan, network design and security.

Introduction:

Brisbane campus comprises of 3 departments and 12 staff; Marketing, Admissions, and IT. Andre Shaw is office manager and is responsible for operations, budgeting and approval for Brisbane site. Tracy Johnson and Angela Sharma are head of Marketing and Admissions department respectively. They both have 3 staff members in their departments. Tracy is responsible for marketing materials, approving contents in the website for Brisbane and organising course information. Angela looks after compliance, student’s documents and policy and procedure. John Son is the IT manager and you are working as the network administrator.

The leased office in Brisbane has 7 rooms and a basic functioning LAN with 7 old PC’s.

With increasing number of laptops and smart mobile devices in the office. It has been decided by the management to establish a wireless local area network. The wireless setup will not only help to increase the mobility of the devices but also help the clients to access the network data. The wireless network helps the following to the campus:

Wireless Network, Assessment Task - I, v_4.0, Last updated on 17/09/2019

Page 6

· Instant transfer of information to social media will be made much easier. For instance, taking a photograph and uploading it to Facebook can generally be done much quicker with wireless technology.

· Wireless LAN will allow the business to bring network access to areas that would be difficult to connect to a wired network.

Mission: To promote student achievement and preparation for global competitiveness by fostering educational excellence

Vision: to become Australia’s best education provider.

BEG education has project management work procedure for gathering and analysing requirements:

Undertaking an interview and analysing the responses

Key Project objectives:

Furthermore, after your meetings and interviews with Andre, Johnson and Angela, following information were collected.

Hardware and

software should be of industry standards.

· Router and WAP must be regularly monitored and backed up.

Page 9

requirements for BEG,

You report must contain:

the bottom centre of the page

· Include your course,

Roman font at either 11pt or 12pt size

· Either have a line

Tasks Marking Scale Marks out of 100
1

Data Gathering techniques

Two information gathering methods

/2
/3
/3
/3
/3
2

Request System Access

/3
3

Network Infrastructure

/5
/5
4
/3

Approximate length

/3

OH&S issues

/3
/2
5
/4
/3

Wireless Network design consideration

/3
6

Hardware and Software Evaluation:

/2
7
/5
8
/2
9
/3

Network address

/3

Host address

/3
/3
/3
/3
T-1.8.1_v.3
Page 12

13. BACKUP PLAN
14. REVIEW AND SIGN OFF
CONCLUSIONS
REFERENCES
APPENDIX-1
APPENDIX-2

All the necessary items that will be used in this project will be named with pricing of the items along with them.

2. Data Gathering Techniques:
As Sydney Education Group (SEG) is a fast growing educational provider the necessary demands are also rapidly increasing. Every IT company needs multiple techniques to gain a complete picture from a diverse set of clients and stakeholders. The two techniques used to gather client requirements for this project are:
Questionaries: By directly asking the people what problem they are facing is the most effective way to solve the issue. Creating a draft and asking what each and every employee would need for their work. As all the employees will not have the equal knowledge in IT, some general questions such as:

Page 14

T-1.8.1_v.3

What desktop features would you like to have/improve on in your current/previous desktops?

In this investigation we will be facing different problems such as:

1. Unstable internet connection/s

To,

IT Manager,

Subject: Request to be granted access to server system

Respected Sir/Madam,
With reference to the above subject, I would like to be granted the access to the server system. As per your request to determine the requirements for the new network, so that business operations can be implemented to satisfy all the critical business requirements.

Page 16

Create a hardware and software requirements details based on various data gathering techniques used. You should include all the required hardware (including WAN, LAN, Wireless and cabling), and software requirements. (including application software and Operating System).

4.1 Hardware requirements:

Wireless Network, Assessment Task - I, v_4.0, Last updated on 17/09/2019

Page 17

NAS

Cat 6

2 meters

Wireless Network, Assessment Task - I, v_4.0, Last updated on 17/09/2019

Page 18

· Type of cable to be used

Most Widely used networking hardware will interconnect using standard patch cables.

Office 1= 4x1

Office 2=4.77x4.26
Office 3= 3.60x2.40
Office 4= 3.60x5.11
Office 5=4.50x1.5
Office 6=4.57x2.5
Office 7=4.00x2.22

1. ·

A registered cabler must perform telecommunications, fire, security and data industries

cabling.

7. Registered cablers must directly supervise an unqualified cabler's cabling work. The registered cabler must ensure the work complies with the wiring rule
Telecommunications cabling advice form, available from .

8. Cablers must cooperate with and help ACMA inspectors and cabling auditors.

You are viewing 1/3rd of the document.Purchase the document to get full access instantly

Immediately available after payment
Both online and downloadable
No strings attached
How It Works
Login account
Login Your Account
Place in cart
Add to Cart
send in the money
Make payment
Document download
Download File
img

Uploaded by : Sonia Kelly

PageId: DOC75E873D