Language:EN
Pages: 24
Rating : ⭐⭐⭐⭐⭐
Price: $10.99
Page 1 Preview
project definition including design consideration

Project definition including design consideration

Assessment 1 - Knowledge Assessment (Written Tasks)

1.1 Aden was contracted recently by ABC Inc in order to upgrade their entire network for next generation network (NGN) capabilities. Currently their system provides Voice
Telephony, Data, and Multimedia services. They have public Wi-Fi hotspots as well and would like their employees to be able to securely access confidential data through them. For that purpose, Aden proposed using a Virtual Private Network (VPN).

1.2 During a project for XYZ International John realises that the company would save more money by switching to a different carrier network. After getting the approval he contacts a few providers who explain what XYZ’s responsibilities would be in the entire process which include connectivity equipment. To reduce the equipment costs John decides he will have to procure the equipment himself rather than have the carrier provide them.

What devices would John have to consider? What purpose do they serve? Does the type of internet service matter?

cautious and do some research. She asks you, her co-worker, for help understanding how

1.4 During the planning phase for her project, Samantha realised she forgot the first step

relating to telecommunications projects in Australia that Samantha should consider.

Optus, an internet service provider (ISP) in Australia.

While speaking to a representative of Optus, Edward is asked about the client premises

ICTPMG611 Prepare a detailed design brief
5 | P a g e
Abbey College Australia
National Provider No. 91136| CRICOS Registration No. 02658G Version V1.3 December 2020

ICTPMG611 Prepare a detailed design brief
6 | P a g e
Abbey College Australia
National Provider No. 91136| CRICOS Registration No. 02658G Version V1.3 December 2020

ICTPMG611 Prepare a detailed design brief
7 | P a g e
Abbey College Australia
National Provider No. 91136| CRICOS Registration No. 02658G Version V1.3 December 2020

ICTPMG611 Prepare a detailed design brief
8 | P a g e
Abbey College Australia
National Provider No. 91136| CRICOS Registration No. 02658G Version V1.3 December 2020

ICTPMG611 Prepare a detailed design brief
9 | P a g e
Abbey College Australia
National Provider No. 91136| CRICOS Registration No. 02658G Version V1.3 December 2020

ICTPMG611 Prepare a detailed design brief
10 | P a g e
Abbey College Australia
National Provider No. 91136| CRICOS Registration No. 02658G Version V1.3 December 2020

Simple port tester is used on testing if different network ports have network accessibility.

We also have NetFlow analyser that keeps the IT team updated on the bandwidth performance at any given time
There is also a device that used in networking auditing called network security auditor that ensures there are no attacks to the network.

Below are some of the hazards and physical obstruction that may be acquired in the process of setting up a networking structure in the company:

According to OSHA, falling from height, electrical shots, equipment failure due to licking or poor rearrangement, structural collapse of towards and inclement weather are some of the hazards.

Assessment 2 - Performance Assessment (Skills)

Requirements

You’ve been hired by CloudStore, a new cloud data storage company which is hoping to make its debut after 12 months. The location is a breezy coastal area in the Northern Territory of Australia.

In keeping with the trend of going green, CloudStore promised investors that they will have a very low carbon footprint and will use green solutions whenever possible.

2.1 Before you can begin you need to determine what laws, rules and regulations might impact the project. This is to protect not only you but the company you work for. Identify what would you refer to for this form of information and explain what aspects of the project or company you would need to research further.

points to start the project)

ICTPMG611 Prepare a detailed design brief
15 | P a g e
Abbey College Australia
National Provider No. 91136| CRICOS Registration No. 02658G Version V1.3 December 2020

The contractor took the stage and projected their presentation for the team to give their critics if any. After 1 hr of discussion, we managed to find that the earlier proposed design for the project owners was okay with everyone. They were happy that the design was below their budget and had factored in the maintenance and operational costs.

Minute 3: Project Drawing presentation

Project approval from

ICTPMG611 Prepare a detailed design brief
17 | P a g e
Abbey College Australia
National Provider No. 91136| CRICOS Registration No. 02658G Version V1.3 December 2020

introduction, Project definition including design consideration, Project time frame etc.

Student can use any standard template; However, Example Points are mandatory)

Project purpose
The project aims to ensure that they safely keep their clients’ data after they have subscribed for the course. Clients will be recruited through subscription and account creation after which they will be given some free space. The client’s account will be subjected to payment if more space is required.

Project goals and objectives
The project’s goal will be to sell safe storage space to individuals and companies. The project objective will to have their customers to store and access their confidential data from the CloudStore portal.

Milestone 5: Testing and handover

ICTPMG611 Prepare a detailed design brief
20 | P a g e
Abbey College Australia
National Provider No. 91136| CRICOS Registration No. 02658G Version V1.3 December 2020

You are viewing 1/3rd of the document.Purchase the document to get full access instantly

Immediately available after payment
Both online and downloadable
No strings attached
How It Works
Login account
Login Your Account
Place in cart
Add to Cart
send in the money
Make payment
Document download
Download File
img

Uploaded by : Stephen Mercer

PageId: DOCDDDD7B8