List the project team should only communicate the project manager
Assessment Task 2
To be filled out and submitted with assessment responses
◻ I declare that this task and any attached document related to the task is all my own work and I have not cheated or plagiarised the work or colluded with any other student(s)
◻ I understand that if I am found to have plagiarised, cheated or colluded, action will be taken against me according to the process explained to me
◻ I have correctly referenced all resources and reference texts throughout these assessment tasks.◻ I have read and understood the assessment requirements for this unit◻ I understand the rights to re-assessment
◻ I understand the right to appeal the decisions made in the assessment
|
---|
Y | N | DNS | ||
---|---|---|---|---|
|
☐ | ☐ | ☐ | |
|
☐ | ☐ | ☐ |
BSBPMG530 - Manage project scope V3 2021 RTO Provider: 91153 - CRICOS Code: 02672K |
---|
|
Y | N | DNS | |
---|---|---|---|---|
☐ | ☐ | ☐ | ||
|
☐ | ☐ | ☐ | |
|
||||
|
|
Y | N | DNS |
---|---|---|---|---|
Task summary and instructions | |
---|---|
|
Task summary and instructions | |
---|---|
|
BSBPMG530 - Manage project scope V3 2021 RTO Provider: 91153 - CRICOS Code: 02672K |
|
---|
Task summary and instructions | |
---|---|
|
|
Task summary and instructions | |||
---|---|---|---|
|
|||
|
|||
Task summary and instructions | |
---|---|
The HR Manager has informed you that there will be an addition to the project
authorisation procedures (Project Management policy) that requires the Project Manager to complete a Project Authorisation Document for approval by the project steering committee.The HR Manager suggests that you should be the one to write a brief paragraph with the additional procedures to include in the Project Management policy.
Ask to set up a meeting with the project steering committee to present the Project Authorisation Document for approval
The text of the email should be in grammatically correct English, written in an appropriate (polite, business-like) style.
Template 1 -Email |
---|
Template 2 -Project Authorisation Document |
---|
BSBPMG530 - Manage project scope V3 2021 RTO Provider: 91153 - CRICOS Code: 02672K |
|
---|
BSBPMG530 - Manage project scope V3 2021 RTO Provider: 91153 - CRICOS Code: 02672K |
---|
| ||
---|---|---|
| ||
Page 15 | ||
|
|
Prepare to present the document
Prepare to negotiate changes and refinement to the document
Use communication techniques such as active listening, questioning and summarising
Use a collaborative approach to achieve shared goals
provided below
| Apply the changes/refinements to the Project Authorisation Document and finalise it |
---|
The trainer and assessor will evaluate your performance during the Role-Play.
If you are absent from class, you are responsible for making alternative arrangements
Incorporate feedback and inputs from stakeholders in the scope plan and finalise it
Schedule a time with the project team in week 4 of class:
Please note that the trainer and assessor will validate that the meeting took place and provide feedback in the marking sheet.
Template 3 -Scope Management Plan |
---|
Management Approach
(6-8 roles)
BSBPMG530 - Manage project scope V3 2021 RTO Provider: 91153 - CRICOS Code: 02672K |
---|
|
---|
BSBPMG530 - Manage project scope V3 2021 RTO Provider: 91153 - CRICOS Code: 02672K |
---|
3.1 Advertise the jobs
3.2 Recruit staff4. Permits and Approval
4.1 Construction permit
4.1.1 Prepare and submit required documents
BSBPMG530 - Manage project scope V3 2021 RTO Provider: 91153 - CRICOS Code: 02672K |
---|
6. Renovation works
6.1 Plan the design for renovation
6.2 Start the renovation works
6.2.1 Interior Renovation
6.2.2 Exterior Renovation
7. Acquisition & Installation
7.1 Purchase Equipment
7.2 Purchase Furniture
7.3 Installation of furniture and equipmentScope boundaries
The project boundaries statement defines the reasonable limits of project work to determine what is included in the project and what's not are. (50-100 words)