including fall restraint devices and fall arrest d

Including fall restraint devices and fall arrest devices appropriate

CPCCCM2012 - Work safely at heights
This document is to help the trainer plan their sessions for delivering the learning content and identify any adjustments that need to be made.

Number of learners allocated to a trainer

Points from previous learning that may need reinforcement e.g. misconceptions:

(Complete as appropriate)

 Additional handouts (this is not a necessary requirement)

Unit elements

 Knowledge Test

 Project

This unit also applies to workers in other industries who need to control the two separate risks associated with people and objects falling from heights.

Completion of the general construction induction training program, specified in the Safe Work Australia model Code of Practice: Construction Work, is required by anyone carrying out construction work.

Resources for third-party

N/A

Assessment submission requirements

Trainer/Assessor must confirm assessment submission details for each unit assessment task.

Knowledge evidence

To be competent in this unit, a candidate must demonstrate knowledge of:

 safe work method statements (SWMSs)

 safety data sheets (SDSs)

Assessors must meet the requirements for assessors outlined in the Standards for Registered Training Organisations.

Assessment must be conducted in the workplace or a simulated workplace using realistic conditions, materials, activities, responsibilities, procedures, safety requirements and environmental considerations.

Classroom

Commencement date

 Listening to instructor

 Completing workbook activities

Maximum = 20 minutes’ break for 1 session

Introduction

 Discuss each activity as they arise and ensure learners fully understand what they are expected to do.

 Use your discretion as to whether they should be completed in groups/pairs/individually, although some

Classroom

Commencement date

 Listening to instructor

 Completing workbook activities

Maximum = 20 minutes’ break for 1 session

Introduction

 Discuss each activity as they arise and ensure learners fully understand what they are expected to do.

 Use your discretion as to whether they should be completed in groups/pairs/individually, although some

Content of session

Classroom

Commencement date

 Listening to instructor

 Completing workbook activities

Maximum = 20 minutes’ break for 1 session

Introduction

 Discuss each activity as they arise and ensure learners fully understand what they are expected to do.

 Use your discretion as to whether they should be completed in groups/pairs/individually, although some

Content of session

height.

 Check fall protection equipment, including required fall restraint and fall arrest devices to ensure

 Completing workbook activities

 Having class/group/pair discussions

Introduction

For the first 5-10 minutes, address the following:

 Use your discretion as to whether they should be completed in groups/pairs/individually, although some

activities may state what is best

Content of session

 Consult with relevant persons to confirm fall protection equipment and safety systems are correctly fitted, adjusted and installed, and are appropriate to the task.

 Access work area safely and move and place tools, equipment and materials using methods that eliminate or minimise the risk of falling objects.

Session 5

Location

4 Hours

Learner activities and tasks

 Asking questions

Small breaks

 Self-introductions students and teacher

 Introduction to unit

Content of session

 Undertake work tasks in compliance with the SWMS and workplace requirements.

 Traverse between anchor points while remaining connected to the fall prevention system and protected

Commencement date

TBA

 Completing workbook activities

 Having class/group/pair discussions

Introduction

For the first 5-10 minutes, address the following:

 Use your discretion as to whether they should be completed in groups/pairs/individually, although some

activities may state what is best

Content of session

 Keep scaffold/work platform components and fall barriers in place during work.

Session Evaluation
(For trainer/assessor’s use to evaluate their sessions and check if learning outcomes have been met)

To what extent were the Learning Outcomes met by all/most/some learners – and how

Identifying Good Practice (What did you do well? What could you change for future sessions?)

You are viewing 1/3rd of the document.Purchase the document to get full access instantly

Immediately available after payment
Both online and downloadable
No strings attached
How It Works
Login account
Login Your Account
Place in cart
Add to Cart
send in the money
Make payment
Document download
Download File
img

Uploaded by : Veer Samra

PageId: DOCBD6947A