FOREWORD
This book is one of many technical management educational guides written from a Department of Defense perspective; i.e., non-Service specific. They are intended primarily for use in courses at Defense Acquisition University and secondarily as a desk reference for program and project man-agement personnel. These guidebooks are written for current and potential acquisition management personnel who are familiar with basic terms and definitions employed in program offices. The guide-books are designed to assist government and industry personnel in executing their management re-sponsibilities relative to the acquisition and support of defense systems.
CONTENTS
Page
1.1 Introduction ........................................................................................................... 1-1
1.2 Testing as a Risk Management Tool.................................................................... 1-1
2.2 Defense System Acquisition Process ................................................................... 2-1
2.3 T&E and the Systems Engineering Process (SEP) ............................................. 2-5
3.1 Introduction ........................................................................................................... 3-1
3.2 The Congress ........................................................................................................ 3-1
Chapter 4 — Program Office Responsibilities for Test and Evaluation
4.1 Introduction ........................................................................................................... 4-1
4.5 Integrated Product Teams for Test and Evaluation.............................................. 4-4
4.6 Test Program Funding/Budgeting......................................................................... 4-4
4.11 PMO Responsibilities for Operational Test and Evaluation ............................... 4-6
4.12 Summary.............................................................................................................. 4-10
5.4 Program Management Documentation ................................................................. 5-4
5.5 Test Program Documentation ............................................................................... 5-6
6.2 Development Test and Evaluation ........................................................................ 6-1
6.3 Operational Test and Evaluation........................................................................... 6-3
6.8 Nuclear Hardness and Survivability (NHS) Testing............................................ 6-9
6.9 Summary................................................................................................................ 6-9
7.3 DT&E Responsibilities ......................................................................................... 7-4
7.4 Test Program Integration ...................................................................................... 7-5
7.8 DT&E of Limited Procurement Quantity Programs ........................................... 7-9
7.9 Summary................................................................................................................ 7-9
8.4 Summary................................................................................................................ 8-6
Chapter 9 — Combined and Concurrent Testing
9.5 Summary................................................................................................................ 9-4
Chapter 10 — Production-Related Testing Activities
10.5 Transition to Production ..................................................................................... 10-2
10.6 Low Rate Initial Production (LRIP) .................................................................. 10-4
11.1 Introduction ......................................................................................................... 11-1
11.2 Purpose of OT&E ............................................................................................... 11-1
11.7 Test Reporting ..................................................................................................... 11-5
11.8 Summary.............................................................................................................. 11-7
12.3 System Development and Demonstration (SDD) .............................................. 12-2
12.4 Production and Deployment (P&D) ................................................................... 12-4
13.1 Introduction ......................................................................................................... 13-1
13.2 Difference Between “Test” and “Evaluation” .................................................... 13-1
13.7 Evaluating Development and Operational Tests ................................................ 13-6
13.8 Summary.............................................................................................................. 13-8
14.4 Support to Test Design and Planning ................................................................ 14-4
14.5 Support to Test Execution .................................................................................. 14-7
Chapter 15 — Test Resources
15.1 Introduction ......................................................................................................... 15-1
x
Chapter 16 — Test and Evaluation Master Plan
MODULE V — Specialized Testing
Chapter 17 — Software Systems Testing
17.5 T&E in the Software Life Cycle ....................................................................... 17-4
17.6 Summary.............................................................................................................. 17-8
18.4 Summary.............................................................................................................. 18-7
Chapter 19 — Logistics Infrastructure T&E
19.5 Summary.............................................................................................................. 19-8
Chapter 20 — EC/C4ISR Test and Evaluation
20.5 T&E of Surveillance and Reconnaissance Systems.......................................... 20-6
20.6 Summary.............................................................................................................. 20-7
21.3 Test Program Responsibilities ............................................................................ 21-2
21.4 Test Team Structure ............................................................................................ 21-3
Chapter 22 — International Test and Evaluation Programs
22.1 Introduction ......................................................................................................... 22-1
22.6 Summary.............................................................................................................. 22-4
Chapter 23 — Commercial and Non-Development Items
23.5 Summary.............................................................................................................. 23-5
Chapter 24 — Testing the Special Cases
24.5 Advanced Concept Technology Demonstrations................................................ 24-5
24.6 Summary.............................................................................................................. 24-5
APPENDICES
Appendix A – Acronyms and Their Meanings
................................................................. A-1
Appendix B – DoD Glossary of Test Terminology
.......................................................... B-1 Appendix
C – Test-Related Data Item Descriptions
......................................................... C-1 Appendix D
– Bibliography
...............................................................................................
D-1 Appendix E – Index
............................................................................................................E-1
Appendix F – Points of Contact for Service Test and Evaluation Courses
..................... F-1
LIST OF FIGURES
Figure 1-1. The 5000 Model
...............................................................................................
1-2 Figure 1-2. Life Cycle Cost Decision Impact and Expenditures
...................................... 1-3 Figure 2-1. Testing and the
Acquisition
Process................................................................
2-2 Requirements to Design
...................................................................................
2-4 Figure 2-2.
Figure 7-2. Design for Testing Procedures ......................................................................... 7-8 Figure 8-1. Relationship of DT&E to the Acquisition Process......................................... 8-1 Figure 8-2. Technical Review Timeline .............................................................................. 8-3 Specifications Summary................................................................................... 8-4 Figure 8-3.
Figure 11-1. Organizational Breakdown of the I-81mm
Mortar Operational Test Directorate ...................................................... 11-6 Figure 12-1. OT&E Related to the Milestone Process ...................................................... 12-2 Figure 12-2. Sources of Data .............................................................................................. 12-3
Figure 14-2. Values of Selected Criteria Conducive to Modeling and Simulation .......... 14-4
Figure 14-3. Modeling and Simulation Application in Test and Evaluation .................... 14-5
Figure 17-3. Spiral Model of AIS Development Process .................................................. 17-5
Figure 18-1. Live Fire Test and Evaluation Planning Guide ............................................. 18-3
Figure 20-4. The Evolutionary Acquisition Process .......................................................... 20-6
Figure 21-1. Simple Multi-Service OT&E Test Team Composition ................................. 21-2
Table 8-1. Technical Reviews and Audits ......................................................................... 8-2
Table 9-1. Combined vs. Concurrent Testing: Advantages and Limitations ................... 9-2
Table 18-1. Relationships Between Key Concepts ........................................................... 18-1
Table 18-2. Types of Live Fire Testing ............................................................................. 18-2
MANAGEMENT OF TEST AND EVALUATION |
||
The Test and Evaluation (T&E) process is an
integral part of the Systems Engineering Process 1.2 TESTING AS A RISK MANAGEMENT
Program Manager (PM) must balance the risks been made.
of cost, schedule, and performance to keep the
1-2
• The focus of T&E should be on how to best
support the acquisition process;
• T&E planning with Operational Test (OT) per- sonnel should start early in the acquisition
• Contractor testing, developmental testing, and operational testing have some overlapping functions;
guidance in reducing the risks frequently associ-ated with test programs. The DoD manual Tran-sition from Development to Production contains sample risk management templates.4