FOREWORD

This book is one of many technical management educational guides written from a Department of Defense perspective; i.e., non-Service specific. They are intended primarily for use in courses at Defense Acquisition University and secondarily as a desk reference for program and project man-agement personnel. These guidebooks are written for current and potential acquisition management personnel who are familiar with basic terms and definitions employed in program offices. The guide-books are designed to assist government and industry personnel in executing their management re-sponsibilities relative to the acquisition and support of defense systems.

CONTENTS

Page

1.1 Introduction ........................................................................................................... 1-1

1.2 Testing as a Risk Management Tool.................................................................... 1-1

2.2 Defense System Acquisition Process ................................................................... 2-1

2.3 T&E and the Systems Engineering Process (SEP) ............................................. 2-5

3.1 Introduction ........................................................................................................... 3-1

3.2 The Congress ........................................................................................................ 3-1

Chapter 4 — Program Office Responsibilities for Test and Evaluation

4.1 Introduction ........................................................................................................... 4-1

4.5 Integrated Product Teams for Test and Evaluation.............................................. 4-4

4.6 Test Program Funding/Budgeting......................................................................... 4-4

4.11 PMO Responsibilities for Operational Test and Evaluation ............................... 4-6

4.12 Summary.............................................................................................................. 4-10

5.4 Program Management Documentation ................................................................. 5-4

5.5 Test Program Documentation ............................................................................... 5-6

6.2 Development Test and Evaluation ........................................................................ 6-1

6.3 Operational Test and Evaluation........................................................................... 6-3

6.8 Nuclear Hardness and Survivability (NHS) Testing............................................ 6-9

6.9 Summary................................................................................................................ 6-9

7.3 DT&E Responsibilities ......................................................................................... 7-4

7.4 Test Program Integration ...................................................................................... 7-5

7.8 DT&E of Limited Procurement Quantity Programs ........................................... 7-9

7.9 Summary................................................................................................................ 7-9

8.4 Summary................................................................................................................ 8-6

Chapter 9 — Combined and Concurrent Testing

9.5 Summary................................................................................................................ 9-4

Chapter 10 — Production-Related Testing Activities

10.5 Transition to Production ..................................................................................... 10-2

10.6 Low Rate Initial Production (LRIP) .................................................................. 10-4

11.1 Introduction ......................................................................................................... 11-1

11.2 Purpose of OT&E ............................................................................................... 11-1

11.7 Test Reporting ..................................................................................................... 11-5

11.8 Summary.............................................................................................................. 11-7

12.3 System Development and Demonstration (SDD) .............................................. 12-2

12.4 Production and Deployment (P&D) ................................................................... 12-4

13.1 Introduction ......................................................................................................... 13-1

13.2 Difference Between “Test” and “Evaluation” .................................................... 13-1

13.7 Evaluating Development and Operational Tests ................................................ 13-6

13.8 Summary.............................................................................................................. 13-8

14.4 Support to Test Design and Planning ................................................................ 14-4

14.5 Support to Test Execution .................................................................................. 14-7

Chapter 15 — Test Resources

15.1 Introduction ......................................................................................................... 15-1

x

Chapter 16 — Test and Evaluation Master Plan

MODULE V — Specialized Testing

Chapter 17 — Software Systems Testing

17.5 T&E in the Software Life Cycle ....................................................................... 17-4

17.6 Summary.............................................................................................................. 17-8

18.4 Summary.............................................................................................................. 18-7

Chapter 19 — Logistics Infrastructure T&E

19.5 Summary.............................................................................................................. 19-8

Chapter 20 — EC/C4ISR Test and Evaluation

20.5 T&E of Surveillance and Reconnaissance Systems.......................................... 20-6

20.6 Summary.............................................................................................................. 20-7

21.3 Test Program Responsibilities ............................................................................ 21-2

21.4 Test Team Structure ............................................................................................ 21-3

Chapter 22 — International Test and Evaluation Programs

22.1 Introduction ......................................................................................................... 22-1

22.6 Summary.............................................................................................................. 22-4

Chapter 23 — Commercial and Non-Development Items

23.5 Summary.............................................................................................................. 23-5

Chapter 24 — Testing the Special Cases

24.5 Advanced Concept Technology Demonstrations................................................ 24-5

24.6 Summary.............................................................................................................. 24-5

APPENDICES
Appendix A – Acronyms and Their Meanings ................................................................. A-1 Appendix B – DoD Glossary of Test Terminology .......................................................... B-1 Appendix C – Test-Related Data Item Descriptions ......................................................... C-1 Appendix D – Bibliography ............................................................................................... D-1 Appendix E – Index ............................................................................................................E-1 Appendix F – Points of Contact for Service Test and Evaluation Courses ..................... F-1

LIST OF FIGURES
Figure 1-1. The 5000 Model ............................................................................................... 1-2 Figure 1-2. Life Cycle Cost Decision Impact and Expenditures ...................................... 1-3 Figure 2-1. Testing and the Acquisition Process................................................................ 2-2 Requirements to Design ................................................................................... 2-4 Figure 2-2.

Figure 7-2. Design for Testing Procedures ......................................................................... 7-8 Figure 8-1. Relationship of DT&E to the Acquisition Process......................................... 8-1 Figure 8-2. Technical Review Timeline .............................................................................. 8-3 Specifications Summary................................................................................... 8-4 Figure 8-3.

Figure 11-1. Organizational Breakdown of the I-81mm
Mortar Operational Test Directorate ...................................................... 11-6 Figure 12-1. OT&E Related to the Milestone Process ...................................................... 12-2 Figure 12-2. Sources of Data .............................................................................................. 12-3

Figure 14-2. Values of Selected Criteria Conducive to Modeling and Simulation .......... 14-4

Figure 14-3. Modeling and Simulation Application in Test and Evaluation .................... 14-5

Figure 17-3. Spiral Model of AIS Development Process .................................................. 17-5

Figure 18-1. Live Fire Test and Evaluation Planning Guide ............................................. 18-3

Figure 20-4. The Evolutionary Acquisition Process .......................................................... 20-6

Figure 21-1. Simple Multi-Service OT&E Test Team Composition ................................. 21-2

Table 8-1. Technical Reviews and Audits ......................................................................... 8-2

Table 9-1. Combined vs. Concurrent Testing: Advantages and Limitations ................... 9-2

Table 18-1. Relationships Between Key Concepts ........................................................... 18-1

Table 18-2. Types of Live Fire Testing ............................................................................. 18-2

MANAGEMENT OF

TEST AND EVALUATION

The Test and Evaluation (T&E) process is an

integral part of the Systems Engineering Process 1.2 TESTING AS A RISK MANAGEMENT

Program Manager (PM) must balance the risks been made.

of cost, schedule, and performance to keep the

1-2

• The focus of T&E should be on how to best

support the acquisition process;
• T&E planning with Operational Test (OT) per- sonnel should start early in the acquisition

• Contractor testing, developmental testing, and operational testing have some overlapping functions;

guidance in reducing the risks frequently associ-ated with test programs. The DoD manual Tran-sition from Development to Production contains sample risk management templates.4

You are viewing 1/3rd of the document.Purchase the document to get full access instantly

Immediately available after payment
Both online and downloadable
No strings attached
How It Works
Login account
Login Your Account
Place in cart
Add to Cart
send in the money
Make payment
Document download
Download File
img

Uploaded by : Aoibhin MacCool

PageId: DOC335C8FE