Critical path delay converters sample and hold circuits
|
|---|
Differential Equations: First order equations (linear and nonlinear), higher order linear differential equations, Cauchy's and Euler's equations, methods of solution using variation of parameters, complementary function and particular integral, partial differential equations, variable separable method, initial and boundary value problems.
Vector Analysis: Vectors in plane and space, vector operations, gradient, divergence and curl,
Circuit Analysis: Node and mesh analysis, superposition, Thevenin's theorem, Norton’s theorem, reciprocity. Sinusoidal steady state analysis: phasors, complex power, maximum power transfer. Time and frequency domain analysis of linear circuits: RL, RC and RLC circuits, solution of network equations using Laplace transform.
Linear 2-port network parameters, wye-delta transformation.
|
|---|
|
|---|
Section 5: Digital Circuits
Number Representations: binary, integer and floating-point- numbers. Combinatorial circuits: Boolean algebra, minimization of functions using Boolean identities and Karnaugh map, logic gates and their static CMOS implementations, arithmetic circuits, code converters, multiplexers, decoders. Sequential Circuits: latches and flip-flops, counters, shift-registers, finite state machines, propagation delay, setup and hold time, critical path delay.Data Converters: sample and hold circuits, ADCs and DACs.
Section 7: Communications
Random Processes: auto correlation and power spectral density, properties of white noise, filtering of random signals through LTI systems.Analog Communications: amplitude modulation and demodulation, angle modulation and demodulation, spectra of AM and FM, super heterodyne receivers.
Section 8: Electromagnetics
Maxwell’s Equations: differential and integral forms and their interpretation, boundary conditions, wave equation, Poynting vector.
| 87 |
|---|


